ETS, Pavilion F

Epsylon was chosen by EBC for the construction of Pavilion F on the l’École de Technologie Supérieure (ETS) campus. The new building, located at the south end of the main pavilion on Rue William in Montréal, is six storeys tall and also has a basement. The building has a total surface area of over 13,000 m² with space for 2,375 students and staff members.

The project was begun in 2021, and includes nearly 30 classrooms, open learning areas, study rooms, offices for research centres and much more. Epsylon is happy to be contributing to a place of learning designed for the coming generations of ETS graduates.

  • Status

    Ongoing
  • Line of business

    Institutional
  • Region

    Canada
  • Contractor

    EBC
  • Owner

    ETS
  • Architect

    MSDL Architectes

Share this project

FacebookTwitterLinkedIn