Epsylon is proud to participate in the development of these high-level facilities, the only ones of their kind in the Montréal North Shore area.
With a surface area of 11,400 m2, the aquatic complex will offer the people of Laval three indoor pools, including one for recreational use, one 50-meter semi-Olympic pool, a wading pool for small children and several other multi-use areas.
The construction work for the aquatic complex will be completed by fall 2024. The steel structure and envelope will be finished by the end of 2023, and fit-up of the building’s interior is currently underway.